Simulation
Tools for Planning Inbound Processing of Passengers and Baggage
BNP’s client list is composed of airlines, airports, government agencies, express companies and architects/engineers who specialize in aviation and logistics.
North America
BNP was brought on board to design the new inbound and outbound Baggage Handling Systems (BHS) for the Terminal Improvements Program at Hilton Head Island Airport.
North America
BNP Associates, Inc. was retained by the Hillsborough County Aviation Authority to validate the existing 30% Checked Baggage Inspection System (CBIS) design and to develop it 100%, including TSA approval.
North America
BNP Associates, working with HOK, redesigned the southeast curbside conveyors and Delta Dash package handling systems to make room for new canopy supports being added as part of the L-MOD program.
North America
STV, Inc. retained BNP to be the Engineer of Record for the Baggage Handling System (BHS) for the New Terminal A at Newark Liberty International Airport (EWR).
North America
Louis Armstrong International Airport, Leo A Daly Architects, in coordination with the Crescent City Aviation Team, obtained BNP’s services to design and develop a new Baggage Handling System (BHS).
Middle East
BNP developed an airport Baggage Handling System (BHS) masterplan for the King Abdulaziz International Airport (KAIA).
Middle East
As part of the design team led by Skidmore, Owings & Merrill (SOM), BNP was retained to provide consulting services for the Baggage Handling System in the new Terminal 2 at Kempegowda International Airport in Bangalore.
North America
The Baggage Handling System (BHS) at Seattle-Tacoma International Airport had seven separate Checked Baggage Inspection Systems (CBIS) in operation, with very little redundancy between systems. The Port retained BNP to redesign the system to accommodate 66 Million Annual Passengers (MAP) due to rapid growth.
Oceania
Since 2019, BNP has been retained by the Brisbane Airport Corporation (BAC) for a number of studies, including both small and large projects.
Europe
KAAN Architects retained BNP as part of an architecture and engineering consortium to design the new Terminal A at Schiphol International Airport in Amsterdam.
North America
BNP was the Baggage Handling System (BHS) design lead for Muller & Muller, Ltd. and the Chicago Department of Aviation, delivering improvements to the Chicago O’Hare International Airport Terminal 5 BHS.
Oceania
As the first step in a major DOT-A initiative to transform baggage handling at Honolulu’s Daniel K. Inouye International Airport, Phase 1 of the Baggage Handling System Improvements project marks a critical leap forward.